Grandmec supports engineering teams developing server, rack and infrastructure equipment with drawing-based machined components. Applications include mounting plates, brackets, housings and mechanical interfaces associated with equipment assembly and thermal integration.
Assembly fit, drawing revisions, repeatability and thermal-component integration need to remain controlled across the equipment build.

Machined mounting bracket for server or rack mechanical integration. Image illustrates machining context only; it is not presented as a completed project in this application.
The following examples describe component scope, not off-the-shelf products or evidence of a completed customer programme.
A drawing review is more useful when the functional interfaces and approved acceptance requirements are clear. Engineering design consultancies can use the same route for prototype iteration and transfer into repeat production.
Answers are shown below for direct review. Final feasibility follows the approved drawing and project-specific requirements.
Related mechanical components can be reviewed together, but each part requires its own material, drawing and acceptance criteria. Cooling assemblies also require a defined joining and test scope.
This page covers server and rack mechanical integration. For cold plates, fluid passages, sealing surfaces, cleanliness and test requirements, see the Liquid Cooling application page.
Need a quick technical fallback? Email info@grandmec.com with the drawing revision, material, quantity and critical requirements.
Share server or infrastructure drawings with the current revision, assembly interfaces, material, quantity and required delivery date.
Optional analytics
Measure public pages and inquiry or click events, without form details or drawing contents. Browsing and RFQ still work if declined.